This site uses cookies to provide you with a great experience. By using Vastern Timber, you accept our use of cookies.

Laying a floor

Contact us

Wootton Bassett
01793 853 281
sales@vastern.co.uk


Calne
01249 813 173
studley@vastern.co.uk

Opening hours

Wootton Bassett
Monday – Thursday 08:00–16:45
Friday 08:00–15:45
Saturday Closed
Sunday Closed

The Sawmills are closed for lunch
Monday–Friday: 13:00–13:30

Calne
Monday – Friday 07:30–17:00
Saturday 09:00–12:00
Sunday Closed

Holiday dates

Wootton Bassett / Studley
 
Xmas & New Year:
Tues 19th Dec 2017 Closed
Wed 3rd Jan 2018 Reopen

Easter:
Thurs 29th Mar 2018 Closed
Tues 3rd Apr 2018 Reopen

May Day:
Fri 4th May 2018 Closed
Tues 8th May 2018 Reopen

Spring:
Fri 25th May 2018 Closed
Mon 4th June 2018 Reopen

Summer:
Fri 27th July 2018 Closed
Mon 13th Aug 2018 Reopen

Late Summer:
Fri 24th Aug 2018 Closed
Tues 28th Aug 2018 Reopen

Helpful tips for laying our hardwood floors.

Fitting any solid hardwood flooring is more than a quick DIY job. If in doubt, employ a professional (having first obtained references).

 

  • Make sure all concrete, plaster and paint is dry before introducing the flooring to a room.
  • Ensure that there is no damp.
  • Acclimatise the flooring by stacking it in the room where it is to be fitted; leave it for two to four weeks before laying (four weeks in the winter). If the room is to have heating, make sure it is on, especially in the winter.
  • If you intend to use under floor heating, contact us first for advice.
  • Ensure that the boards are laid straight down the room. Walls are rarely straight.
  • Always leave a 10-15mm expansion gap all the way around the edge, including around fire surrounds etc.
  • Make sure that the base to which you are fixing the flooring is dry, flat and sound.
  • Secure the boards to the base by nailing or by using a recommended adhesive.
  • Specialist flooring nailers are available to hire.
  • If laying the boards on joists, the ends of the floorboards must be joined on the joist.
  • Randomly mix the board widths as you lay them.
  • Make sure that the three widths are used up evenly.
  • You may need to trim some ends to make them absolutely square.
  • Once laid, the floor will require sanding. Best results will be achieved by using a combination of belt sander, orbital sander and edge / corner sander.
  • Vacuum the floor to remove dust and then wipe the floor with a cloth dampened in white spirit.
  • Apply recommended floor seal with appropriate applicator in even strokes along the length of the boards.
  • Sit back and admire the beauty and quality of a solid hardwood floor.
Laying a floor 1 Laying a floor 2 Laying a floor 3 Laying a floor 4 Laying a floor 4 Laying a floor 5 Laying a floor 6

Contact us

Wootton Bassett
01793 853 281
sales@vastern.co.uk


Calne
01249 813 173
studley@vastern.co.uk

Opening hours

Wootton Bassett
Monday – Thursday 08:00–16:45
Friday 08:00–15:45
Saturday Closed
Sunday Closed

The Sawmills are closed for lunch
Monday–Friday: 13:00–13:30

Calne
Monday – Friday 07:30–17:00
Saturday 09:00–12:00
Sunday Closed

Holiday dates

Wootton Bassett / Studley
 
Xmas & New Year:
Tues 19th Dec 2017 Closed
Wed 3rd Jan 2018 Reopen

Easter:
Thurs 29th Mar 2018 Closed
Tues 3rd Apr 2018 Reopen

May Day:
Fri 4th May 2018 Closed
Tues 8th May 2018 Reopen

Spring:
Fri 25th May 2018 Closed
Mon 4th June 2018 Reopen

Summer:
Fri 27th July 2018 Closed
Mon 13th Aug 2018 Reopen

Late Summer:
Fri 24th Aug 2018 Closed
Tues 28th Aug 2018 Reopen

 Contact

Sign up for news about wood, woods and woodland

Request a quote

Request a quote
Data
Marketing